Rework in job costing, journal entry (continuation of 18-40). Assume that the five spoiled units of Whitefish

Question:

Rework in job costing, journal entry (continuation of 18-40). Assume that the five spoiled units of Whitefish Machine Shop's Job # 10 can be reworked for a total cost of $1,800. A total cost of $5,000 associated with these units has already been assigned to Job # 10 before the rework. REQUIRED Prepare the journal entries for the rework, assuming:

a. The rework is related to a specific job.

b. The rework is common to all jobs.

c. The rework is considered to be abnormal.

LO1