Briefly outline the impact that job sequence has on each of the layout types. From this, we
Question:
Briefly outline the impact that job sequence has on each of the layout types.
From this, we can see that departments 1 and 2 have the greatest interdepartmental work flow, so they should be close, perhaps at B and E. Next, work flows for 1–3 and 1–4 are high. Note, though, that the work flow for 3–4 is low, suggesting that they need not be close. Instead, we would place them on either side of department 1. Note also that 3–4 is only 2, 3–5 is 0, while 3–6 is 20 and 4–5 is 13. Hence, place department 3 at location D, department 4 at location F, and department 5 at location C.
A Dept. 6 D
Dept. 3 E
Dept. 1 F
Dept. 4 B
Dept. 2 C
Dept. 5 Total cost:
Trip b
Distance c
Frequency
(b × c × $2)
Cost 1–2 (B–E) 40 125 $ 10,000 1–3 (D–E) 50 62 6,200 1–4 (F–E) 50 64 6,400 1–5 (E–C) 60 25 3,000 1–6 (A–E) 80 50 8,000 2–3 (B–D) 90 10 1,800 2–4 (B–F) 70 17 2,380 2–5 (B–C) 50 26 2,600 2–6 (A–B) 50 54 5,400 3–4 (F–D) 120 2 480 3–5 (D–C) 140 0 0 3–6 (A–D) 50 20 2,000 4–5 (C–F) 50 13 1,300 4–6 (A–F) 130 2 520 5–6 (A–C) 100 5 1,000
$ 51,080
LO.1
Step by Step Answer: