Given the following product structure, master produc- tion schedule, and inventory status (Figure 14.15 on the next

Question:

Given the following product structure, master produc- tion schedule, and inventory status (Figure 14.15 on the next page) and assuming the requirements for each BOM item is 1:

(a) develop a gross requirements plan for Item C;

(b) develop a net requirements plan for Item C. P ....14.12 Based on the data in Figure 14.15, complete a net material requirements schedule for:

a) All items (10 schedules in all), assuming the requirement for each BOM item is I.

b) All 10 items, assuming the requirement for all items is 1.

except B, C, and F, which require 2 each. P