Prepare a master production schedule for industrial pumps in the manner of Figure 11.11 in the chapter.
Question:
Prepare a master production schedule for industrial pumps in the manner of Figure 11.11 in the chapter.
Use the same inputs as the example, and lot sizes of 70, but change the MPS rule from “schedule production when the projected on-hand inventory would be negative without production” to “schedule production when the projected on-hand inventory would be less than 10 without production.”
LO.1
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Question Posted: