Projects A and B are being considered by a firm with an MARR of $18 %$; the

Question:

Projects A and B are being considered by a firm with an MARR of $18 \%$; the VP has emphasized that the projects are mutually exclusive (the other 2 VPs don't seem to think it matters) and that he prefers the analysis be done with PW calculations as "today matters more than tomorrow" (and the engineering manager thinks there's a problem with that, too). Which of the two alternatives should the engineering manager recommend?