The critical path for the project is: (a) A-B-D-GHIK-L-M. (b) A-B-D-GH-JM. (c) A-C-E-FH-IK-L-M. (d) A-C-E-FH-JM.
Question:
The critical path for the project is:
(a) A-B-D-G—H—I—K-L-M.
(b) A-B-D-—G—H-J—M.
(c) A-C-E-F—H-I—K-L-M.
(d) A-C-E-F—H-J—M.