Manufacturing overhead is allocated to jobs in an (A B C) system by using the following formula:
Question:
Manufacturing overhead is allocated to jobs in an \(A B C\) system by using the following formula:
a. Activity cost allocation rate \(\times\) Estimated amount of activity allocation base used by the job
b. Activity cost allocation rate \(\div\) Estimated amount of activity allocation base used by the job
c. Activity cost allocation rate \(\times\) Actual amount of activity allocation base used by the iob
d. Activity cost allocation rate \(\div\) Actual amount of activity allocation base used by the job