Using internal rate of return, a project is rejected if the internal rate of return a. is

Question:

Using internal rate of return, a project is rejected if the internal rate of return

a. is less than the required rate of return.

b. is equal to the required rate of return.

c. is greater than the cost of capital.

d. is greater than the required rate of return.

e. produces a NPV equal to zero.