5.14. Calculate the capacity and load percentage per work center (casting and machining) for the jobs B
Question:
5.14. Calculate the capacity and load percentage per work center (casting and machining)
for the jobs B 110 and B220. Assume 50 hours is available per week for each work center.
Work Centers Casting Machining Efficiency 0.95 0.90 Utilization 0.90 0.92 Production/week Week 1 Week 2 B 110 (time required in hours in each work centers)
0.30 0.18 50 35 B220 (time required in hours in each work centers)
0.35 0.20 60 40