6.12. An order for 100 of a product is run on work center 10. The setup time is 1 hour, and the run time is 5 minutes per piece. Since the order is a rush and there are two machines in the work center, it is decided that the order will be split and run on both machines. Calculate the manufacturing lead time before and after splitting.