Advanced: Key factor and make or buy decision A construction company has accepted a contract to lay
Question:
Advanced: Key factor and make or buy decision A construction company has accepted a contract to lay underground pipework. The contract requires that 2500 m of 10" pipe and 2000 m of 18" pipe be laid each week.
The limiting factor is the availability of special¬ ized equipment. The company owns 15 excavating machines (type A) and 13 lifting and jointing machines (type B). The normal operating time is 40 hours a week but up to 50% overtime is acceptable to the employees.
The time taken to handle each metre of pipe is:
A subcontractor has offered to lay any quantity of the 10" pipe at £18 per metre and of the 18" pipe at £12 per metre.
You are required to:
(a) calculate the most economical way of under¬ taking the contract; (15 marks)
(b) state the weekly cost involved in your solution to
(a) above; (5 marks)
(c) comment on the factors that management should consider in reaching a decision whether to adopt the minimum cost solution.
Step by Step Answer: