Alxenor SA has a power plant designed and built to serve its three factories. Data for 2022

Question:

Alxenor SA has a power plant designed and built to serve its three factories. Data for 2022 are as follows:image text in transcribed

Actual fixed costs of the power plant were €1 million in 2022; actual variable costs, €2 million.
Required 1 Calculate the amount of power costs that would be allocated to Iraklion using a single-rate method.
2 Calculate the amount of power costs that would be allocated to Iraklion using a dual-rate method.