Computing Job Costs [LO3] Weaver Company s predetermined overhead rate is $18.00 per direct labor-hour and its
Question:
Computing Job Costs [LO3]
Weaver Company ’s predetermined overhead rate is $18.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-200:
Direct materials . . . . . . . . . . . . . $200 Direct labor . . . . . . . . . . . . . . . . . $120 Required:
1. What is the total manufacturing cost assigned to Job A-200?
2. If Job A-200 consists of 50 units, what is the average cost assigned to each unit included in the job?