ProNet Systems allocates manufacturing overhead based on machine hours. Each connector should require 10 machine hours. According

Question:

ProNet Systems allocates manufacturing overhead based on machine hours. Each connector should require 10 machine hours. According to the static budget, ProNet expected to incur: 1,000 machine hours per month ( 100 connectors \(\times 10\) machine hours per connector) \(\$ 8.000\) in fixed manufacturing overhead costs During August, Provet actually used 825 machine hours to make the 75 connectors. Pro Net's predetermined standard total manufacturing overhead rate is

a. \(S 5.25\) per machine hour

b. \(\$ 13.25\) per machine hour

c. \(\$ 8.00\) per machine hour

d. \(\$ 16.06\) per machine hour

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Accounting

ISBN: 9780132439602

7th Edition

Authors: Charles T. Horngren, Walter T. Harrison

Question Posted: