The predetermined overhead rate equals
  a.  actual overhead divided by actual activity level for a period.
  b.  estimated overhead divided by estimated activity level for a period.
  c.  actual overhead minus estimated overhead.
  d.  actual overhead multiplied by actual activity level for a period.
  e.  one-twelfth of estimated overhead.