2. Discuss the need for temporary workers in the drawing department.Ron Garcia felt good about his first
Question:
2. Discuss the need for temporary workers in the drawing department.Ron Garcia felt good about his first week as a management trainee at Mexicana Wire Winding, Inc. He had not yet developed any technical knowledge about the manufacturing process, but he had toured the entire facility, located in the suburbs of Mexico City, and had met many people in various areas of the operation.
Mexicana, a subsidiary of Westover Wire Works, a Texas firm, is a medium-sized producer of wire windings used in making electrical transformers. Carlos Alverez, the production control manager, described the windings to Garcia as being of standardized design. Garcia’s tour of the plant, laid out by process type (see Figure 16 ), followed the manufacturing sequence for the windings: drawing, extrusion, winding, inspection, and packaging. After inspection, good product is packaged and sent to finished product storage; defective product is stored separately until it can be reworked.
Step by Step Answer:
Managerial Decision Modeling With Spreadsheets
ISBN: 9781292024196
3rd Edition
Authors: Barry Render