An article in Advanced Semiconductor Manufacturing Conference (ASMC) (May 2004, pp. 32529) stated that dispatching rules and

Question:

An article in Advanced Semiconductor Manufacturing Conference (ASMC) (May 2004, pp. 325–29) stated that dispatching rules and rework strategies are two major operational elements that impact productivity in a semiconductor fabrication plant (fab). A four-factor experiment was conducted to determine the effect of dispatching rule time (5 or 10 min), rework delay (0 or 15 min), fab temperature (60 or 80F), and rework levels (level 0 or level 1) on key fab performance measures.

The performance measure that was analyzed was the average cycle time. The experiment was blocked for the fab temperature. Data modified from the original study are shown in the following table.

image text in transcribed

(a) What effects are confounded with block? Do you find any concern with confounding in this design? If so, comment on it.

(b) Analyze the data and draw conclusions.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Engineering Statistics

ISBN: 9780471388791

2nd Edition

Authors: Douglas C. Montgomery, George C. Runger, Norma F. Hubele

Question Posted: