2. The jobs listed in the following table are waiting at work center 41. The shop works...
Question:
2. The jobs listed in the following table are waiting at work center 41. The shop works 8 hours per day.
a. Arrange the jobs.in sequence for work center 41 according to the shortest-processing-
time rule.
b. Arrange the jobs according to the lowest average slack per operation (equation 13.1).