Arunachalam Narayanan has been clocked performing three work elements in the office, with the results shown in
Question:
Arunachalam Narayanan has been clocked performing three work elements in the office, with the results shown in the following table. The allowance for tasks such as this is 15%.
OBSERVATIONS (SECONDS) PERFORMANCE ELEMENT 1 2 3 4 5 6 RATING (%)
1 13 11 14 16 51* 15 100 2 3* 21 25 73* 26 23 110 3 3 3.3 3.1 2.9 3.4 2.8 100
*Disregard—possible error.
a) Find the normal time.
b) Find the standard time.
Additional problem 10.43, available in MyLab Operations Management, is a time study with four elements and seven observations.