Question: Breeze Toothpaste Company has been having a problem with some of the tubes of toothpaste leaking. The tubes are packed in containers with 100 tubes
Breeze Toothpaste Company has been having a problem with some of the tubes of toothpaste leaking. The tubes are packed in containers with 100 tubes each. Ten containers of toothpaste have been sampled. The following number of tooth- paste tubes were found to have leaks: Number of Number of Sample Leaky Tubes Sample Leaky Tubes 6 4 8 7 6 II 2 10 3 12 8 9 4 11 9 5 5 12 10 8 Total 85 Develop a p-chart with three-sigma control limits and evaluate whether the process is in statistical control.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts