Daily samples of 100 power drills are removed from the assembly line at Drills by Stergios Fotopoulos
Question:
Daily samples of 100 power drills are removed from the assembly line at Drills by Stergios Fotopoulos and inspected for defects. Over the past 21 days, the following information has been gathered. Develop a 3 standard deviation (99.73% confidence) p-chart and graph the samples. Is the process in control?
DAY 1 2 3 4 5 6 7 8 9 10 11 DEFECTIVES 6 5 6 4 3 4 5 3 6 3 7 DAY 12 13 14 15 16 17 18 19 20 21 DEFECTIVES 5 4 3 4 5 6 5 4 3 7
Step by Step Answer:
Related Book For
Operations Management Sustainability And Supply Chain Management
ISBN: 9781292295039
13th Global Edition
Authors: Jay Heizer, Barry Render, Chuck Munson
Question Posted: