In the simulation of an order policy for drills at Simkins hardware (Example F2, pp. 833835), would

Question:

In the simulation of an order policy for drills at Simkin’s hardware (Example F2, pp. 833–835), would the results (of Table F.7) change significantly if a longer period were simulated? Why is the 10-day simulation valid or invalid? lop5