Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows: L 0 1
JOB OPERATION 1
(HOURS)
OPERATION 2
(HOURS)
A 10 5 B 7 4 C 5 7 D 3 8 E 2 6 F 4 3 Determine a sequence that will minimize the total completion time for these jobs. Illustrate graphically.