Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the

Question:

Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows: L 0 1 

JOB OPERATION 1

(HOURS)

OPERATION 2

(HOURS)

A 10 5 B 7 4 C 5 7 D 3 8 E 2 6 F 4 3 Determine a sequence that will minimize the total completion time for these jobs. Illustrate graphically.