1 Four jobs must be processed on a single machine. The time required to perform each job...

Question:

1 Four jobs must be processed on a single machine. The time required to perform each job and the due date for each job are shown in Table 74. Use the branch-and-bound method to determine the order of performing the jobs that minimizes the total time the jobs are delayed.

image text in transcribed