2 A company is planning to manufacture a product that consists of three parts (A, B, and...
Question:
2 A company is planning to manufacture a product that consists of three parts (A, B, and C). The company anticipates that it will take 5 weeks to design the three parts and to determine the way in which these parts must be assembled to make the final product. Then the company estimates that it will take 4 weeks to make part A, 5 weeks to make part B, and 3 weeks to make part C. The company must test part A after it is completed (this takes 2 weeks).
The assembly line process will then proceed as follows:
assemble parts A and B (2 weeks) and then attach part C (1 week). Then the final product must undergo 1 week of testing. Draw the project network and find the critical path, total float, and free float for each activity. Also set up the LP that could be used to find the critical path.
When determining the critical path in Problems 3 and 4, assume that m activity duration.
Step by Step Answer:
Operations Research Applications And Algorithms
ISBN: 9780534380588
4th Edition
Authors: Wayne L. Winston