25 Reconsider Problem 24. Suppose that at the beginningof year 1, power plants 14 have been constructed

Question:

25 Reconsider Problem 24. Suppose that at the beginningof year 1, power plants 1–4 have been constructed and are in operation. At the beginning of each year, PSI may shut down a plant that is operating or reopen a shut-down plant The costs associated with reopening or shutting down a plant are shown in Table 105. Formulate an IP to minimize the total cost of meeting the demands of the next five years.
(Hint: Let

image text in transcribed

image text in transcribed