3 Use the WagnerWhitin and SilverMeal methods to find production schedules for the following dynamic lotsize problem:
Question:
3 Use the Wagner–Whitin and Silver–Meal methods to find production schedules for the following dynamic lotsize problem: K $30, h $1, d1 40, d2 60, d3
10, d4 70, d5 20.