Ignall and Schrage developed branch and bound algorithm to minimize the makespan for scheduling problem. (a) Single

Question:

Ignall and Schrage developed branch and bound algorithm to minimize the makespan for scheduling problem.

(a) Single machine

(b) Flow shop

(c) Job shop

(d) None of the above AppendixLO1