LO 3.4 The critical path of a network is the: a) shortest-time path through the network. b)
Question:
LO 3.4 The critical path of a network is the:
a) shortest-time path through the network.
b) path with the fewest activities.
c) path with the most activities.
d) longest-time path through the network.