Use the schematic below to answer these EV questions. Assume the status point is time 15. Calculate
Question:
Use the schematic below to answer these EV questions. Assume the status point is time 15.
Calculate the following EV parameters based on this schematic.
A. SPI = _______________________________ B. CPI = ________________________________ C. EAC = _______________________________ D. ETC = _______________________________ E. Using the theory of Earned Schedule calculate the schedule status for the project shown above. Show your calculations and explain the result.
ES is ___________________________________