Select a hypothetical project (e.g., designing and LO3 building a Web site, installing a new machine in an assembly line, or conducting a major inspection and repair of a passenger aircraft), and briefly describe an example of how each of the following types of control data might be used for project control:
(a) Frequency counts
(b) Raw numbers
(c) Subjective numeric ratings
(d) Indicator and surrogate measures