Question
Assume an auditor is evaluating a statistical attribute sample of 50 items that resulted in three deviations. What should the auditor conclude if the tolerable
Assume an auditor is evaluating a statistical attribute sample of 50 items that resulted in three deviations. What should the auditor conclude if the tolerable deviation rate is 7 percent, the expected population deviation rate is 5 percent, and the allowance for sampling risk is 2 percent?
a. The planned assessed level of control risk should be modified because the tolerable deviation rate plus the allowance for sampling risk exceeds the expected population deviation rate.
b. The sample results should be accepted as support for the planned assessed level of control risk because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable deviation rate.
c. The sample results should be accepted as support for the planned assessed level of control risk because the tolerable deviation rate less the allowance for sampling risk equals the expected population deviation rate.
d. The planned assessed level of control risk should be modified because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable deviation rate.
Step by Step Solution
3.38 Rating (151 Votes )
There are 3 Steps involved in it
Step: 1
Expected population deviation rate This rate refers to the deviation which the auditor expects to ex...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started