Question
Polymer Molding, Inc., is considering two processes for manufacturing storm drains. Plan A involves conventional injection molding that will require making a steel mold at
Polymer Molding, Inc., is considering two processes for manufacturing storm drains. Plan A involves conventional injection molding that will require making a steel mold at a cost of $2 million. The cost for inspecting, maintaining, and cleaning the molds is expected to be $5000 per month. Since the cost of material for this plan is expected to be the same as for the other plan, this cost will not be included in the comparison. The salvage value for plan A is expected to be 10% of the first cost. Plan B involves using an innovative process known as virtual engineered composites wherein a floating mold uses an operating system that constantly adjusts the water pressure around the mold and the chemicals entering the process. The first cost to tool the floating mold is only $25,000, but because of the newness of the process, personnel and product-reject costs are expected to be higher than those for a conventional process. The company expects the operating costs to be $45,000 per month for the first 8 years and then to decrease to $10,000 per month thereafter. At an interest rate of 12% per year, which process should the company select on the basis of an annual worth analysis over a 3-year study period?
Step by Step Solution
3.42 Rating (158 Votes )
There are 3 Steps involved in it
Step: 1
Present worth analysis of Plan A PW A Initial cost Present value of operatin...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Document Format ( 2 attachments)
6095096bbcb3c_25482.pdf
180 KBs PDF File
6095096bbcb3c_25482.docx
120 KBs Word File
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started