Question
STEELCO manufactures two types of steel (steel 1 and steel 2) at two locations (plant 1 and plant 2). Three resources are needed to manufacture
STEELCO manufactures two types of steel (steel 1 and steel 2) at two locations (plant 1 and plant 2). Three resources are needed to manufacture a ton of steel: iron, coal, and blast furnace time. The two plants have different types of furnaces, so the resources needed to manufacture a ton of steel depend on the location (see Table below). Each plant has its own coal mine. Each day 12 tons of coal is available at plant 1 and 15 tons at plant 2. Each day, plant 1 has 10 hours of blast furnace time available, and plant 2 has 4 hours available. Iron ore is mined in a mine located midway between the two plants; 80 tons of iron is available each day. Each ton of steel 1 can be sold for $170/ton, and each ton of steel 2 can be sold for $160/ton. All steel that is sold is shipped to a single customer. It costs $80 to ship a ton of steel from plant 1, and $100 a ton from plant 2. BlueRail is a railway company which can ship coal between the two plants at $50/ton. However, BlueRail does not accept a job less than 6 tons. Steelco needs to maximise its profit. Please use linear programming (LP) to help Steelco decide whether to hire BlueRail or not. (10 marks)
Product steel 1 and plant steel 2 and plant steel 1 and plant steel 2 and plant Iron SL9 0 8 6 7 5 Coal 3 3132 2 Blast 2 1 1
Step by Step Solution
3.44 Rating (151 Votes )
There are 3 Steps involved in it
Step: 1
We first make the following summary table for resource each day Plant 1 Plant 2 Coal in tons ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance