Question
Successful completion of a construction project depends on the supply of materials and labor as well as the weather condition. Consider a given project that
Successful completion of a construction project depends on the supply of materials and labor as well as the weather condition. Consider a given project that can be success fully completed if either one of the following conditions prevails:
(a) Good weather and at least labor or materials are adequately available.
(b) Bad weather but both labor and materials are adequately available.
Define:
G = Good weather
G = Bad weather
L = Adequate labor supply
M = Adequate materials supply
C = successful completion
Suppose P(L) = 0.7: P(G) = 0.6 and L is independent of both M and G. If the weather is good, adequate supply of materials is guaranteed, whereas the probability of adequate supply of material is only 50% if bad weather prevails.
(a) Formulate the event of successful completion in terms of G, L. and M.
(b) Determine the probability of successful completion.
(c) If the project was successfully completed, what is the probability that labor supply and been inadequate?
Step by Step Solution
3.50 Rating (163 Votes )
There are 3 Steps involved in it
Step: 1
a Event of successful completion of project depends on the following events Adequate labor supply ad...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Document Format ( 2 attachments)
609614ec09ccf_26582.pdf
180 KBs PDF File
609614ec09ccf_26582.docx
120 KBs Word File
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started