Answered step by step
Verified Expert Solution
Question
1 Approved Answer
0% Calculations ()% Final Result (10)% Mark (30) A construction site of a new settlement, including an airport with A run way for an A330,
0% Calculations ()% Final Result (10)% Mark (30) A construction site of a new settlement, including an airport with A run way for an A330, A380 plane, and a flyover bridge on weak soil connecting the settlement to the center city, uses the following materials, coarse sand (zone 1), crushed dolomite, crushed limestone, Crushed basalt. Portland cement types, CEMI, CEMII, Sulfate resisting, and relatively low heat cement. And slag, silica fume, limestone powder, superplasticizers types C, D, G, and F. And Reinforcing steel, mild of diameters 8, 10, deformed high tensile of diameters 12, 16, 18, and deformed high grade of diameters 22, 25, and 38mm. Also too fine sand was found during excavation of the site. Direct the pre-mentioned materials in the suitable construction discipline and elements, and mention the quality control tests required and the code limits for each material. The environmental conditions of the site are mild in all seasons, except for summer season, where the temperature varies from 40 to 50C and wind velocity varies in the range of 16 to 20kM/H. 0% Calculations ()% Final Result (10)% Mark (30) A construction site of a new settlement, including an airport with A run way for an A330, A380 plane, and a flyover bridge on weak soil connecting the settlement to the center city, uses the following materials, coarse sand (zone 1), crushed dolomite, crushed limestone, Crushed basalt. Portland cement types, CEMI, CEMII, Sulfate resisting, and relatively low heat cement. And slag, silica fume, limestone powder, superplasticizers types C, D, G, and F. And Reinforcing steel, mild of diameters 8, 10, deformed high tensile of diameters 12, 16, 18, and deformed high grade of diameters 22, 25, and 38mm. Also too fine sand was found during excavation of the site. Direct the pre-mentioned materials in the suitable construction discipline and elements, and mention the quality control tests required and the code limits for each material. The environmental conditions of the site are mild in all seasons, except for summer season, where the temperature varies from 40 to 50C and wind velocity varies in the range of 16 to 20kM/H
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started