( 1 . 1 : Modeling ) Matt is a software engineer writing a script involving 6 tasks. Each must be done one after the
: Modeling Matt is a software engineer writing a script involving tasks. Each
must be done one after the other. Let ti be the time needed to complete the ith
task. These times have a certain structure:
The total time needed to complete any adjacent tasks is half the total time
required to complete the next two tasks.
The second task takes second.
The fourth task takes seconds.