Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

1. a. 125.03 b.118.17 c.242.80 d.58.08 2. 3. 4. 5 c. 816.00 d. 429.97 Help Seve&Exit Subm Faz, Inc, manufactures and sells two products: Product

1. image text in transcribed
a. 125.03
b.118.17
c.242.80
d.58.08
2.
image text in transcribed
3.
image text in transcribed
4.
image text in transcribed
5
image text in transcribed
c. 816.00
d. 429.97
Help Seve&Exit Subm Faz, Inc, manufactures and sells two products: Product X0 and Product W7. Deta concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below Expected Direct Labor- Total Direct Production Hours Per Unit Labor-Bours Product x0 2,000 8,000 Product W7 480 960 Total direct labor-hours 8,960 The direct labor rate is $2760 per DLH. The direct materials cost per unit is $152.50 for Product X0 and $134 for Product W The company is considerling adopting an activity-based costing system with the following activity cost pools, actvity messures, and expected activity Estinated Expected Activity Activity Overhead Activity Cost Pools Measures Cont Produet xo Product 7Total Labor-related $280,078 DLEs 8,000 60 8.960 1,360 Produetion orders orders 19,748 780 580 4,080 H 244-014 Order size 4,180 8.260 8543,840 based on direct labor-hours using ts traditionai costing method, the overhead assigned to each unit of Product Xo would be closest If the company allocates all of its overhead to: (Round your intermediate calculation to 2 decimal places) Adelberg Company has two products: A and B. The annual production and sales of Product A is 2.300 units and of Product 8 is 1,700 units. The direct labor-hours as the basis for applying all manufecturing overheed to products. Product A requires 0.3 direct lebor-hours per unit and Product B requires 0.6 direct lebor hours per unit. The total estimated overhead for next p The company is considering switching to an activity-based costing system for the purpose of computing unit product costs for external reports. The new activity-based costing system would have three overhead activity cost pools-Actvity 1, Activity 2, and Order Size-with estmated overhead costs and expected activity as follows: is $105,475. Expected Activity Overhead B Total 2,800 3,100 roduct Activity ts 1,600 2,300 1,200 800 1,020 32,592 18,564 Activity2 1,710 690 54,319 Order size $105,475 Total (Note: The Order Size activity cost poors costs are allocated on the basis of direct labor-hours overhead rate under the treditional costing system is closest to The $5.99 per DLH O $317 per Ou $6168 per DLUH $1164 per DLH Adelberg Compeny has two products: A and B. The annual production and sales of Product A is 1,800 units and of Product B is 1,200 units. The company hes treditionalily used as the basis for applying all manufacturing overheed to products Product A requires 0.5 direct lebor-hours per unit end Product B requres 0.8 direct lebor- hours per unit. The total estimated overhead for next period is $99,975 costing system for the purpose of computing unit product costs for external reports. The new activity based costing to an a system would have three overhead activity cost pools-Activity 1, Activity 2, and Order Sire-with estimeted overhead costs and expected activity as follows Overhead 1,100 1,800 900 $30,892 700 1,800 17,596 Activity 2 Order size 300 2,100 1,860 51,487 960 total $28.08 $4300 g Company has two products: A and B. The annual production and sales of Product A is 2,150 units and of Product 8 is 1,550 units. The company has traditionaily used direct labor-hours as the besis for applying all manufacturing overheed to products. Product A requires 0.3 direct labor-hours per unit and Product B requires 06 direct labor. hours per unit. The total estimated overhead for next compan n considerin s te ing to i ncti ty ased costing system for he purpose of com ting unt product costs for external eports. The new acti ity based costing system would have three overhead ectivity cost pools-Activity 1, Activity 2, and Order Size- with estimated overhead costs and expected activity as follows Expected Activity Overhead ivity cont Pools conts Product A 32,074 1.450 18,269 2,150 53,457 2,500 1,050 650 2,800 1,575 Activity 2 Order size 930 $103,800 Total The Order Size activity cost pool's costs are allocated on the basis of direct iabor-hours) (Note: The predetermined overhead rate (Le, activity rate) for Activity 2 under the activity-based costing system is closest to $8.50 $652 $3707 hours (DLHs) required to produce that output appear below 600 1,200 2,400 2,400 1,200 390 ordere 7,580 251,386 3,890 Order size Round you

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions