Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

1. A new highway is to be constructed. Asphalt paving will be used. The asphalt will cost $180/ft, including the material and paving operation. Due

image text in transcribed
1. A new highway is to be constructed. Asphalt paving will be used. The asphalt will cost $180/ft, including the material and paving operation. Due to heavy usage, the asphalt is expected to last 5 years before requiring resurfacing. The cost of resurfacing will be the same price/ft in the future. Paved ditches must be installed on each side of the highway and will cost $52.50/ft to install; ditches will have to be repaved in 15 years at a cost equal to the initial cost. Four pipe culverts are required/mile; each costs $28,000 and will last 10 years; replacements will cost $10,000, each, forever. Annual maintenance of the highway will cost $9,000/mi. Cleaning each culvert will cost $1,250/yr. Cleaning and maintaining each ditch will cost $3.75/ft every year. Important reminder: There are four culverts each mile. Two ditches are necessary (there is one on each side of the roadway). Using a 3.0% MARR, what is the capitalized cost (CC) per mile for the highway

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial economics applications strategy and tactics

Authors: James r. mcguigan, R. Charles Moyer, frederick h. deb harris

12th Edition

9781133008071, 1439079234, 1133008070, 978-1439079232

Students also viewed these Economics questions

Question

What are the attributes of a technical decision?

Answered: 1 week ago