Question
1. A systems engineer is assigned a task of checking if the hospital has to switch to product costing method. There are two types of
1. A systems engineer is assigned a task of checking if the hospital has to switch to product costing method. There are two types of patients, A and B. The engineer has collected 10 data points for each type, representing the times they consume for the service. The times are given below, in hours:
Type A 0.45 0.30 1.00 1.20 1.40 0.25 0.50 0.70 2.10 1.20
Type B 2.20 1.60 1.40 0.90 2.50 1.40 0.20 0.30 1.80 3.20
The process costs $300 per hour. The product costing will be recommended only if costs for the two types are significantly different. Conduct a t-test to check if there is any significant difference in the costs for the two populations.
Use an alpha value of 0.05. Define H0 and H1 clearly.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started