1 . how long does the project take to complete? [ hint: recall the critical Path Method ] 2 . Now suppose that the duration
how long does the project take to complete? hint: recall the critical Path Method
Now suppose that the duration of B can either be or each with equal likelihood. How long on average does the project take to complete?