1. Predetermined overhead rate: 130% 2. Underapplied overhead 3,800 3. Prepare a schedule of cost of goods manufactured for the year. Assume all raw materials
1. Predetermined overhead rate: 130%
2. Underapplied overhead 3,800
3. Prepare a schedule of cost of goods manufactured for the year. Assume all raw materials used in production as direct materials.
4. Compute the unadjusted cost of goods sold for the year. Do not include any underapplied or overapplied overhead in your answer.