Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

1. What is the companys plantwide overhead rate? 2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and

image text in transcribed1. What is the companys plantwide overhead rate?

2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z?

3. What is the activity rate for the Machining activity cost pool?

4. What is the activity rate for the Machine Setups activity cost pool?

5. What is the activity rate for the Product Design activity cost pool?

6. What is the activity rate for the General Factory activity cost pool?

7. Which of the four activities is a batch-level activity?

8. Which of the four activities is a product-level activity?

9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?

10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?

11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z?

12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z?

13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z?

14. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z?

15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z?

Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimaterd Overhead Expected Activity Activity Cost Pool Machining Machine setups Production design General factor Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Cost $ 231,000 11,000 MHS $ 180,000 $ 94,000 $ 260,000 10,000 DLHs 300 setups 2 products Activity Measure Machining Number of setups Number of products Direct labor-hours ProductY 9,000 Product Z 2,000 60 240 9,000 1,000

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

ICSA Study Text In Management Accounting

Authors: Richard Lyall

4th Edition

186072308X, 978-1860723087

More Books

Students also viewed these Accounting questions

Question

=+ ^ What is the budget for this project?

Answered: 1 week ago

Question

=+What information is needed?

Answered: 1 week ago