Question
1. What is the Limiting Cycle time, or Bottleneck, of the line. How many pieces per hour will this line run. 2. In a work
1. What is the Limiting Cycle time, or Bottleneck, of the line. How many pieces per hour will this line run.
2. In a work hour that has a 15 minute break, how many parts will the line above be able to produce.
3. How frequent will a Part be placed into a box.
4. Who has Idle Time with this balance.
5. Calculate the Manpower Requirements for this line. How many Operators should this line be run with.
6. Given the Shift Work Schedule below, calculate the Takt Time. (This is not the Takt Time above, which was given).
Daily Volume=500 Shifts=1 Minutes/Shift=480 Start Up Meeting=5 Breaks 2 @ 10 MIN=20 Lunch Up Paid=30 Clean Up=10 |
7. A Widget assembly line has 5 Operators on it. The Earned time is 0.1200 hours per piece. The line works a 10 hour shift one day and produces 400 parts. What is the efficiency of the assembly line.
8. A Company that produces Steering Gears for Nissan has an assembly line that has an efficiency of 88.5%. This line is scheduled to run parts 7.2 hrs out of an 8 hour shift. The scrap rate for this line is 2.5%. What is the OEE of the assembly line.
Aurin OUT HW_Le Balance & E concy_2012_Students - Excel Garch- Sampe. Evan (camos Pic Home Insert Page Layout Fermuar Data Review View Hep Share Comments Calib IIAA General Bad Atem- Good 20T X Cut Ilhom ute 3 format Panter Wrap Test === Morge Camat 27 O @ BTW- A S%971 Normal Condon Format Neutral Fuum.lling Tule Calculation Check Insert Delete com - Sort finde Fibo - Scut- Eating Analyze Duis Ana Fam Alq Number Styles Cell Senty 11 so A B D G HStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started