Answered step by step
Verified Expert Solution
Question
1 Approved Answer
1) What's the cost of a 750 KTA polypropylene facility built in Bangkok, Thailand given the following? - A polypropylene plant with a 1025
1) What's the cost of a 750 KTA polypropylene facility built in Bangkok, Thailand given the following? - A polypropylene plant with a 1025 KTA capacity was built in Orange, Texas in 2014 for a total of $1.3 B -The capacity factors to the right -SB = $A *((capacity B/ capacity A)") chlorine e= 0.7 $A = 1.3b $B=1.04b $US $US Capacity A Capacity B= 1025 KTA 750 KTA product capacity factors acolynitrile butadiene 0.6 0.68 0.45 ethanol 0.73 ethylene oxide 0.78 hydrochloric acid 0.68 hydrogen peroxide 0.75 methanol 0.6 nitric acid 0.6 phenol 0.75 polymerization 0.58 polypropylene 0.7 PVC 0.6 sulfuric acid 0.65 styrene 0.6 thermal cracking 0.7 0.7 0.65 0.8 2) What's the cost of the same facility as described in question 1 given the following adjustments? - The project expects an escalation factor of 1.30 from 2014 to 2022 -The project in Bangkok doesn't require piling like the project in Orange, so there is a $17MM deduction -The project in Thailand has a lower construction productivity due to monsoon season and restricted construction windows requiring a 1.41 modifier - The project in Thaliland is based upon a modular execution methodolgy, while the project in Orange, TX was stick-built. The expected modifier in execution methodology difference is 0.90. -The government of Thailand has created a new permit for projects that create byproducts of plastic. This will add 15% to the cost of the project in Thailand. - Labor cost is cheaper in Thailand, leading to a 10% deduction to the project cost. 3) What's the dollar per KTA cost of the facility in Thailand and the dollar per KTA cost of the facility in Orange? $USD/ KTA Price of the facility in Thailand $USD/ KTA Price of the facility in Orange 4) What's the cost of an LNG facility in Western Australia with all utility systems, acid gas removal, dehydration, mercury removal, LPG processing, and CO2 treatment given that the base facility was $950/ MTPA? urea vinyl acetate vinyl chloride
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started