10. A production line at Triple L Manufacturing has three stations. The first station can process a unit in 10 min. The second station
10. A production line at Triple L Manufacturing has three stations. The first station can process a unit in 10 min. The second station has two identical machines and each machine can process a unit in 12 min.(each unit only needs to be processed in one of the two machines). The third station can process a unit in 8 min. Illustrate the production flow. 11. What is the throughput time of the production line? 12. What is the bottleneck station and the bottleneck rate? 13. If the firm operates 8 hrs/day, 6 days per week, what is the weekly capacity of the production line?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started