10 Complete the time study by filling in the circles. Then, calculate a standard time for an 8-h job. Assume a 10 percent allowance. Time
10
Complete the time study by filling in the circles. Then, calculate a standard time for an 8-h job. Assume a 10 percent allowance. Time Check Time Study Observation Form Study No.: Finishing Time Operation: Starting Time 8:11 Elapsed Time Element No. and B Description A TEBS 0.45 TEAF Noto Cycle R W OT NT R W OT NT Total Check Time 1 110 55 110 75 Effective Time 2 130 83 130 00 Ineffective Time 0.00 Total Recorded Time Unaccounted Time 0.00 Recording Error % 0.00 Standard timeStep by Step Solution