10. You have been asked to plan the staffing for an RE field office for a $36 million project to be constructed over a period of two years. Using the table and graph provided, determine: a. Determine the optimum FCI (use these hourly salaries: RE - $70, Inspector - $45, clerk - $25) b. What is the probable total number of field personnel recommended c. List their classifications and the total number of personnel in each field classification recommended for the project. Resident engineer plus inspectors (E&I) $ Million construction cost/Year Field clerk (CLK) Const. cost/Yr To 1 mil. 3 million 5 million 10 million 3 4 5 6 7 8 9 Person years/Year Field Staff E&I Cik 1 0 1.5 0.5 2 1 4 1.5 10 11 12 1 2 Project Size Inspection Person-Years/Year Less than $1 million per year $1 to $5 million per year Over $5 million per year 1.0 2.5 2.5 plus 2.0 for each additional $5 million or portion thereof 10. You have been asked to plan the staffing for an RE field office for a $36 million project to be constructed over a period of two years. Using the table and graph provided, determine: a. Determine the optimum FCI (use these hourly salaries: RE - $70, Inspector - $45, clerk - $25) b. What is the probable total number of field personnel recommended c. List their classifications and the total number of personnel in each field classification recommended for the project. Resident engineer plus inspectors (E&I) $ Million construction cost/Year Field clerk (CLK) Const. cost/Yr To 1 mil. 3 million 5 million 10 million 3 4 5 6 7 8 9 Person years/Year Field Staff E&I Cik 1 0 1.5 0.5 2 1 4 1.5 10 11 12 1 2 Project Size Inspection Person-Years/Year Less than $1 million per year $1 to $5 million per year Over $5 million per year 1.0 2.5 2.5 plus 2.0 for each additional $5 million or portion thereof