Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

CHAPTER 10 10-136 A 10-MW geothermal power plant is being consid- ered at a site where geothermal water at 230C is available. Geothermal water

CHAPTER 10 10-136 A 10-MW geothermal power plant is being consid- ered at a site where geothermal water at 230°C is available

CHAPTER 10 10-136 A 10-MW geothermal power plant is being consid- ered at a site where geothermal water at 230C is available. Geothermal water is to be flashed into a chamber to a lower pressure where part of the water evaporates. The liquid is returned to the ground while the vapor is used to drive the steam turbine. The pressures at the turbine inlet and the tur- bine exit are to remain above 200 kPa and 8 kPa, respec- tively. High-pressure flash chambers yield a small amount of steam with high exergy whereas lower-pressure flash cham- bers yield considerably more steam but at a lower exergy. By trying several pressures, determine the optimum pressure of the flash chamber to maximize the power production per unit mass of geothermal water withdrawn. Also, determine the thermal efficiency for each case assuming 10 percent of the power produced is used to drive the pumps and other auxil- iary equipment. Turbine Flash chamber 230C Geothermal water

Step by Step Solution

3.32 Rating (149 Votes )

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Thermodynamics An Engineering Approach

Authors: Yunus A. Cengel, Michael A. Boles

8th edition

73398179, 978-0073398174

More Books

Students also viewed these Mechanical Engineering questions