Question

1 Approved Answer

1.Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for

1.Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data:

Total machine-hours 32,500
Total fixed manufacturing overhead cost $ 455,000
Variable manufacturing overhead per machine-hour $ 5

Recently, Job T687 was completed with the following characteristics:

Number of units in the job 10
Total machine-hours 40
Direct materials $ 710
Direct labor cost $ 1,420

The amount of overhead applied to Job T687 is closest to: (Round your intermediate calculations to 2 decimal places.)

2.Adelberg Corporation makes two products: Product A and Product B. Annual production and sales are 875 units of Product A and 800 units of Product B. The company has traditionally used direct labor-hours as the basis for applying all manufacturing overhead to products. Product A requires 0.8 direct labor-hours per unit and Product B requires 0.5 direct labor-hours per unit. The total estimated overhead for next period is $129,400.

The company is considering switching to an activity-based costing system for the purpose of computing unit product costs for external reports. The new activity-based costing system would have three overhead activity cost pools--Activity 1, Activity 2, and General Factory--with estimated overhead costs and expected activity as follows:

Expected Activity
Activity Cost Pool Estimated Overhead Costs Product A Product B Total
Activity 1 $ 54,180 1,400 700 2,100
Activity 2 35,400 1,300 700 2,000
General Factory 39,820 700 400 1,100
Total $ 129,400

(Note: The General Factory activity cost pool's costs are allocated on the basis of direct labor-hours.)

The overhead cost per unit of Product B under the activity-based costing system is closest to:

Multiple Choice

  • $43.50

  • $51.30

  • $22.50

  • $56.16

Garrison 16e Rechecks 2017-06-28

Multiple Choice

  • $760.00

  • $455.00

  • $875.60

  • $152.00

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions